Skip to product information
Men's Curved Basketball Shoes With Thick Soles
$120.36
Sale price
$120.36
Regular price
$120.36
Complete with eyelets and a lace up closure for a classic look
- The upper is made of PU and the sole is made of Rubber
- Feature:Fashion Trend, Anti-Slippery, Hard-Wearing, Shock-Absorbant
- Season: Autumn, Spring, Summer, Winter
- Occasion: Outdoor, Sports
- Gender: Men
- Care Instruction: Spot clean only
- Custom area is the upper, for custom areas please refer to yoycol mockup generator for details
- This product is made on demand. No minimums
- Multiple shipping options available, and cost varies on time efficiency.
Size Guide
| EUR Size | US Size | Insole Length(inch) | Insole Length(mm) |
| 39 | 6 | 9.9 | 251 |
| 40 | 7 | 10.2 | 259 |
| 41 | 8 | 10.5 | 266 |
| 42 | 8.5 | 10.6 | 270 |
| 43 | 9.5 | 10.9 | 278 |
| 44 | 10 | 11.1 | 283 |
| 45 | 11 | 11.4 | 290 |
| 46 | 12 | 11.7 | 296 |
| 47 | 12.5 | 11.9 | 303 |
| 48 | 13 | 12.2 | 311 |
| 49 | 14 | 12.5 | 318 |
| 50 | 15 | 12.7 | 323 |
Product measurements may vary by up to 3~5mm